Project Jupiter — 1,400-acre AI data center campus in Doña Ana County, New Mexico, to be powered by up to 2.45 GW of Bloom Energy solid-oxide fuel cells; replaces previously planned gas turbines and diesel generators; consolidates campus into single microgrid; ~92% NOx reduction vs. prior gas plan; up to $165B total campus investment with 4 data center buildings
Oracle, BorderPlex Digital Assets, and Bloom Energy announced that Project Jupiter — the AI data center campus in Doña Ana County, NM — will be powered by up to 2.45 GW of Bloom solid-oxide fuel cells, replacing the previously planned gas turbines and diesel generators. The microgrid consolidates the 1,400-acre, 4-building campus into a single energy system, cuts NOx ~92% versus the prior gas design, and uses far less water than combustion alternatives. Oracle expects up to $165B in total campus investment, ~4,000 construction jobs and 1,500 ongoing roles. This is among the largest single fuel-cell deployments ever announced and a defining moment for behind-the-meter clean firm power for AI compute.
Deal Value
2,450MW
Capacity
Fuel Cell
Technology
NM
Location
Deal Details
- Deal Type
- Behind-the-Meter Generation
- Seller / Sponsor
- Bloom Energy
- Buyer / Financier
- Oracle
- Offtaker
- Oracle
- Stage
- Development
- ISO/RTO
- WECC
Related Deals
Lighthouse Campus — ~2 GW renewable energy infrastructure (solar, wind, battery storage), Port Washington, Wisconsin
Vantage Data Centers / WEC Energy Group → Oracle / OpenAI
$15B campus investment
Bloom Energy / Oracle 2.8 GW solid oxide fuel cell power partnership — AI data center distributed generation; 1.2 GW initial tranche deployed, up to 2.8 GW under master agreement
Bloom Energy → Oracle Corporation
1 GW data center + 3 SMR plan — Oracle hyperscale data center campus powered by ~1,000 MW of SMRs (~3 reactors, vendor TBD)
TBD (vendor selection underway) → Oracle
1,000 MW
80 MW PPA from the 471 MW Mockingbird Solar Center under construction near Paris, Texas — brings project to fully contracted status
Ørsted (Mockingbird Solar Center) → Bloomberg LP
Juniper IIA Wind Farm — 98.4 MW onshore wind, Oregon
Iberdrola / Avangrid → Amazon
98 MW
Timber Road IV Wind Farm — 125 MW in Paulding County, Ohio
EDP Renewables North America → Microsoft
125 MW
Get deals like this in your inbox
Free weekly clean energy deal intelligence. Every Monday.