Meta–Noon Energy ultra-long-duration storage reservation — up to 1,000 MW / 100,000 MWh (~100-hour discharge) carbon-oxygen battery; 25 MW / 2,500 MWh pilot targeted for 2028 COD
Largest publicly disclosed corporate commitment to ultra-long-duration storage. Meta reserves up to 1 GW / 100 GWh of Noon Energy's carbon-oxygen multi-day chemistry to firm 24x7 AI/data-center load. First 25 MW / 2.5 GWh pilot targeted for 2028. Announced together with Meta's Overview Energy space-solar reservation (ppa-2026-022) as a paired 'always-on' clean-firm package.
Deal Value
1,000MW
Capacity
100,000MWh
Storage
Storage
Technology
US (data center grid)
Location
Deal Details
- Deal Type
- Long-duration energy storage offtake / capacity reservation
- Seller / Sponsor
- Noon Energy
- Buyer / Financier
- Meta Platforms
- Offtaker
- Meta Platforms
- Stage
- Development
- ISO/RTO
- Multiple
- Source
- Meta Newsroom
Related Deals
Echols Grove Solar (253 MWdc, Lamar County TX) + Cedar Range Solar (188 MWdc, Hopkins County TX) — 441 MWdc total portfolio, Texas (ERCOT)
Zelestra (formerly known as X-Elio Energy) → Meta Platforms
441 MW
Entergy Louisiana / Meta Northeast Louisiana Data Center — up to 2,500 MW solar + BESS (3 locations), 5,200+ MW natural gas, 240 mi 500 kV transmission, Richland Parish, LA
Entergy Louisiana → Meta Platforms
Echols Grove Solar (253 MWdc, Lamar County TX) + Cedar Range Solar (188 MWdc, Hopkins County TX) — 441 MWdc combined, long-term PPAs with Meta
Zelestra (formerly X-Elio; EQT-backed) → Société Générale, HSBC
$600M
80 MW PPA from the 471 MW Mockingbird Solar Center under construction near Paris, Texas — brings project to fully contracted status
Ørsted (Mockingbird Solar Center) → Bloomberg LP
Juniper IIA Wind Farm — 98.4 MW onshore wind, Oregon
Iberdrola / Avangrid → Amazon
98 MW
Timber Road IV Wind Farm — 125 MW in Paulding County, Ohio
EDP Renewables North America → Microsoft
125 MW