Casselman Wind Farm — 35 MW onshore wind, Somerset County, PA (PJM), Statkraft 35 MW REC offtake, operational since 2007
Short-term 5-year US REC VPPA; Statkraft is the corporate REC offtaker for the entire 35 MW PA wind farm. Second of two 2024 Avangrid–Statkraft VPPAs (the prior 300 MW Streator Cayuga Ridge South wind RECs is excluded as project >100 MW). PPA price not disclosed publicly; will be imputed from regional comparables. Discovered via DealFlow research sweep (agent: 2023-2024-longtail).
Deal Value
35MW
Capacity
Wind
Technology
PA
Location
Deal Details
- Deal Type
- Corporate VPPA
- Seller / Sponsor
- Avangrid Renewables
- Buyer / Financier
- Statkraft (US REC offtake from Avangrid)
- Offtaker
- Statkraft (US REC offtake from Avangrid)
- Stage
- Operating
- ISO/RTO
- PJM
- Source
- Statkraft press release
Related Deals
Coyote Ridge Wind Farm — 98 MW onshore wind, South Dakota (SPP)
Avangrid Renewables (Iberdrola) → Google
Tatanka Ridge Wind Farm — 98 MW onshore wind, South Dakota (SPP)
Avangrid Renewables (Iberdrola) → Google
Karankawa Wind Farm (Nike share) — 86 MW wind, TX (ERCOT)
Avangrid Renewables → Nike
Amazon Wind Farm Texas / Dermott Wind — 253 MW onshore wind, Scurry County, Texas (ERCOT). Original PPA signed Sept 2015 with Lincoln Clean Energy; LCE acquired by Ørsted Aug 2018. Project COD October 19, 2017.
Lincoln Clean Energy (acquired by Ørsted Aug 2018) → Amazon
Summit Farms Solar — 60 MW solar, Currituck County, North Carolina (Duke)
Dominion Energy → MIT (consortium with Boston Medical Center + Post Office Square Redev)
SCDA Solar 1 (Sacramento Airport PV) has North and East site — Solar project, CA (CAISO), 6.800000000000001 MW, COD 2017.
Corporate
Get deals like this in your inbox
Free weekly clean energy deal intelligence. Every Monday.