Duffy BESS — 235 MW / 470 MWh lithium-ion battery storage, Matagorda County, Texas
DESRI signed preferred equity financing agreement with Linea Energy for Duffy BESS. Debt structure (closed December 2025) includes construction-to-term loan, tax equity bridge, and LC facility led by NORD/LB as coordinating lead arranger with Societe Generale and SMBC as joint lead arrangers.
Deal Value
235MW
Capacity
470MWh
Storage
Battery Storage
Technology
TX
Location
Deal Details
- Deal Type
- Project Finance
- Seller / Sponsor
- Linea Energy
- Buyer / Financier
- DESRI (D.E. Shaw Renewable Investments) — preferred equity; NORD/LB (coordinating lead arranger); Societe Generale + SMBC (joint lead arrangers)
- Stage
- Construction
- ISO/RTO
- ERCOT
- Source
- PR Newswire / DESRI
Related Deals
Watertown Solar — 172 MWdc utility-scale solar, Sanilac County, Michigan
Linea Energy → Consumers Energy
Watertown Solar — 172 MWdc utility-scale solar, Sanilac County, Michigan
Linea Energy (sponsored by EnCap Investments L.P.) → Santander Corporate & Investment Banking (lead arranger), Société Générale, NORD/LB, Truist Bank (joint lead arrangers)
Intersect Power three standalone BESS projects (Texas)
Intersect Power → Multiple
$837M
8-project distributed generation BESS portfolio — 79.2 MW (8 × 9.9 MW), ERCOT South, Texas (Port Lavaca, Corpus Christi, Victoria, McAllen)
Aggreko IPP Solutions → Bimergen Energy (NYSE American: BESS)
79 MW
Boxcar Battery Energy Storage System — 300 MWh / 150 MW BESS, Wylie, Texas (ERCOT)
esVolta → MUFG Bank (lead lender); Generate Capital
$140M
SunZia Wind (3,515 MW) + SunZia Transmission (550-mile HVDC, 3,000 MW capacity) — largest clean energy infrastructure project in US history
Pattern Energy Group → Multiple (consortium)
$11B
Get deals like this in your inbox
Free weekly clean energy deal intelligence. Every Monday.