Quilt Block Wind Farm
EDP Renewables signed a 20-year PPA with Dairyland Power Cooperative for the entire 98 MW output of the Quilt Block wind farm in Lafayette County, Wisconsin.
98MW
Capacity
Wind
Technology
WI
Location
Deal Details
- Deal Type
- Utility PPA
- Seller / Sponsor
- EDP Renewables
- Buyer / Financier
- Dairyland Power Cooperative
- Offtaker
- Dairyland Power Cooperative
- Deal Value
- Undisclosed
- Stage
- operating
- ISO/RTO
- MISO
- Source
- Windpower Engineering
Related Deals
Bright Stalk Wind Farm — 123 MW wind, IL (MISO)
EDP Renewables → Walmart
Headwaters II Wind Farm — 60 MW wind, IN (MISO)
EDP Renewables → Walmart
Harvest Ridge Wind Farm — 50 MW wind, IL (MISO)
EDP Renewables → Walmart
Red Barn Wind Energy Generating Station (Wind, Grant County, WI, ~92 MW, COD 2022)
ALLETE Clean Energy → Wisconsin Public Service / WEC Energy
Forward Wind Energy Center
Invenergy → Wisconsin Public Service
$174M
Amazon Wind Farm Texas / Dermott Wind — 253 MW onshore wind, Scurry County, Texas (ERCOT). Original PPA signed Sept 2015 with Lincoln Clean Energy; LCE acquired by Ørsted Aug 2018. Project COD October 19, 2017.
Lincoln Clean Energy (acquired by Ørsted Aug 2018) → Amazon
Get deals like this in your inbox
Free weekly clean energy deal intelligence. Every Monday.